ro ru en

State
News
Agency

Regional road segment renovated in central Moldova

19:45 | 31.05.2023 Category: Regional

Chisinau, 31 May /MOLDPRES/ - A segment of the road G67 G66 – Văsieni – Bahu – R21, km 5.6-8.1, has been repaired. The final reception of works took place today.    

According to the State Administration of Roads (ASD), the length of the segment under repair is of 2.39 km. The road has two lanes and the width of the roadway is of about six metres. Following the project’s implementation, the roadway was rehabilitated, seven small bridges were repaired, about 86 road signs were set and over 714 square metres of road marking was applied.    

The works’ value was 14.3 million lei (715,000 euros) – allocated from Road Fund’s means. 

The road’s modernization will improve the access of the citizens from the Vasieni settlement, central Telenesti district, to a modern infrastructure.

Photo: ASD

 

img23004396

img23004396

img23004396

Any material published on the website of the Public Institution ’’A.I.S. Moldpres’’ (Moldpres News Agency) is intellectual peoperty of the Agency, protected by the copyright. The taking over or/and use of these materials will be made only with the Agency’s agreement and with compulsory reference to source.